The early start to run from about July to November. Nine process includes the following steps. The first stage project proposal. The second’s limits including planning the project. The third stage analyzes user requirements and system design. The fourth stage database design. The fifth stage design interfaces.
The sixth stage of the development system. The seventh stage testing the system. The eighth stage installs and modifies the system adjustment and the final stage document and the need to identify those responsible for the project coordinator.