If Bennett’s maximum acceptable payback period is 2.75 years, project A would be rejected, and project B would be accepted. If the maximum payback period were 2.25 years, both projects would be rejected. If the projects were being ranked, project B would be preferred over project A, since it has a shorter payback period (2.5 years versus 3.0 years).