• All unit loads and top filling solutions shall be 100% compliant to IOS-P-0010.
• The test route should (as far as possible) be selected in a way that it is possible to repeat the test over time. The transportation test route shall be minimum 200km of which min. 5km is of “bumpy” nature. The test route shall include the following situations at least four times each: