On Sunday 28 September 2014 has caused under voltage at Hall 1-4 at 1.30 PM. From initial inspection it happened from lightning. From this situation has effected to Hall 1- 4 electricity was cut 30%. However, it did not have effected with air condition system since Sodexo reboot lighting system.