OR-Notes
J E Beasley
OR-Notes are a series of introductory notes on topics that fall under the broad heading of the field of operations research (OR). They were originally used by me in an introductory OR course I give at Imperial College. They are now available for use by any students and teachers interested in OR subject to the following conditions.
A full list of the topics available in OR-Notes can be found here.
Just-in-time (JIT)
Introduction
Just-in-time (JIT) is easy to grasp conceptually, everything happens just-in-time. For example consider my journey to work this morning, I could have left my house, just-in-time to catch a bus to the train station, just-in-time to catch the train, just-in-time to arrive at my office, just-in-time to pick up my lecture notes, just-in-time to walk into this lecture theatre to start the lecture. Conceptually there is no problem about this, however achieving it in practice is likely to be difficult!
So too in a manufacturing operation component parts could conceptually arrive just-in-time to be picked up by a worker and used. So we would at a stroke eliminate any inventory of parts, they would simply arrive just-in-time! Similarly we could produce finished goods just-in-time to be handed to a customer who wants them. So, at a conceptual extreme, JIT has no need for inventory or stock, either of raw materials or work in progress or finished goods.
Obviously any sensible person will appreciate that achieving the conceptual extreme outlined above might well be difficult, or impossible, or extremely expensive, in real-life. However that extreme does illustrate that, perhaps, we could move an existing system towards a system with more of a JIT element than it currently contains. For example, consider a manufacturing process - whilst we might not be able to have a JIT process in terms of handing finished goods to customers, so we would still need some inventory of finished goods, perhaps it might be possible to arrange raw material deliveries so that, for example, materials needed for one day's production arrive at the start of the day and are consumed during the day - effectively reducing/eliminating raw material inventory.
Adopting a JIT system is also sometimes referred to as adopting a lean production system. More about JIT can be found here, here, here and here.