(1) Mould Assembly with Machine: This process starts at the mould inspection station.
Moulds are then sent to the mould assembly station and the filling station respectively.
(2) Mould Assembly with Gasket: This process starts at the mould inspection station and then the mould is assembled with a gasket. A spring is added to the mould at the spring assembly station.
Moulds are then sent to the same filling station as in mould assembly with a machine line.
The
resources allocation is shown in Table 1.
From a method and time study, the standard time can be calculated as shown in Figure 6