Extend the smoke detection system into the Spinning Control Room that is already installed in the adjacent DCS Room, including under the false floor, and consideration also given to extending the similarly installed CO2 system under the floor of the Spinning Control Room (and any other Control Rooms not so equipped.)
Actions taken
DCS Room is relocated to new location. Room construction completed and Job for smoke detector and CO2 is under progress.
Target Date
3 – 6 months / Target for completion by 30th Oct’13