Construction activities will be maximized during dry season, but minimized in areas nearby watercourse during rainy season;
Effluent drainage/diversion will be separated with the stormwater drainage which collecting water from the surrounding catchment areas;
Construction and stockpiles will be managed to prevent contamination to receiving water bodies;