Lift Slab Contruction:
This is a accepted technique when it comes to useing cast
and prestressed slabs in the groundlevel or for raising them
from the ground level to mount levels. Two way continous
slabs are often effective in reducing cracks as they control the
thickness requireement and at the same time elimate cracks
in the long run. In he use of prestressed slabs researchers
such as Lin have commented that s
range of 6-10 m are often more economical than the rest [11]
[13]. Prestressed also comes in different forms of coffered or
grid floors in lift slab cosntructions. The grid floors are more
slender in appearance and can also be used
ressed concrete ribbons in
[10].
-tensioned
.
.
olid prestressed in the
for artisitic