Employment History 1. Duration of work Owner Main Contractor Position Project reference Summary
Activity
: From January, 2014 to October, 2014 : CEC International (Thailand Branch) Ltd. : CEC International (Thailand Branch) Ltd. : Seaworld Engineering and Construction Co., Ltd : QA/QC Manager : EP3 Generator Raise Deck Project, Etc. : Control fabrication and installation of piping work follow with international Standard such as ASME, AWS D.11and DNV 2.7-1. - Prepare inspection and test plan (ITP). - Prepare and review procedure for fabrication, installation and inspection of piping work, Structure and other work. -