Believe I may have sent something on this already but wanted to insure clarity before we do this.
I plan to connect the FactoryTalk servers uninterruptible power supply (UPS) system into the FBR power supply on generator backup. Due to our system now being server based all operator interfaces pass through this server. Therefore I need to have this powered through the generator to allow control of the FBR during long power outages. What this means is that if the FBR main distribution board or it downstream emergency distribution boards are taken out of service for some reason the Dryer, Reaction Tanks and Wet Milling will be affected as the operator interfaces will only function until the UPS runs out of battery (1-2 hrs).
I will let you know if I can install some type of automatic switch to allow dual power supply i.e. from existing and FBR in cases like this but not 100% sure if this is possible. May have to be manual.