Heavy-duty shoring systemSeven prefabricated heavy-duty scaffolding staging sets were rotated within the site to keep pace with the construction cycle of each building block. Each component of the shoring system is of the “wedge and click” type for easy and safe installation. The estimated productivity improvement is about 115% compared to the conventional scaffolding system.Precast constructionWoh Hup used precast construction including civil defence shelter doorframes, staircases, planter boxes and double slabs. The estimated productivity improvement from these precast activities is about 80% compared to cast-in-situ construction.Productive formworksVarious productive formworks such as horizontal tableform, condek formwork and vertical steel formwork were adopted to reduce the construction cycle time. The estimated productivity improvement is about 80% compared to conventional timber formwork.Innovative cast-in groove linesInnovative cast-in groove lines were used to form the hexagonal patterns at the transfer decks soffits, to reduce double work. This resulted in an estimated productivity improvement of about 200%