The priority of installation points shall be :
1. Point 14) HPM-1401 (material sent)
2. Point 13) 1”-LO-1038-A3CS2 (material sent)
3. Point 10-11-12) 3 LCV (material sent)
4. Yellow Pipe as attached pdf. File (prefabrication portion not deliver yet)
5. Point 15) Support PIT 1920 (material sent)