TP confirmed dimension of trench (1.5W x 1.2D) in Machine hall. Trench depth inside compactor room to drop from 1.2 to 1.4m to allow for elevator conveyor. Sump pit will be the same level as in engineering drawings. TP to issue drawings from conveyor and compactor supplier.