The machine model: MP-3 is packed into two(2) or three(3) export
standard wooden case. C/NO.l is main machine, C/N0.2 is in-feeding
conveyor, C/N0.3 is shrink tunnel machine. To uncharted at least the
cover and one side of wooden case and remove main machine by forklift
carefully. Loosen 4 fixing screws a little higher than 4 wheels at machine
base. Then move out main machine to the proper place for installation, the
place should be a very leveled ground with good ventilation, free from
humidity, high temperature, and keep enough space around main machine.
It should be very carefully leveled main machine, then tighten 4 fixing
screws downward the ground.