The EPCIC contract award followed the 2012 dual Front End Engineering Design (FEED) study for the project undertaken by two consortia – the Modec Inc., CB&I Nederland B.V and Toyo Engineering Corporation consortium and the JGC Corporation, Samsung Heavy Industries Company Limited, JGC (Malaysia) Sdn Bhd and Samsung Heavy Industries (M) Sdn Bhd consortium.