24.10.2008 A variety of new facilities are handed over for operation in time for the changeover to the winter 2008 flight plan: the new arrivals hall, the altered “Grüezi B” area, a new connecting corridor, and new bus gates B01 to B10, with tax and duty-free shop
and Bar 110. This new infrastructure is part of the “Zurich 2010” construction project encompassing the alterations associated with the introduction of the Schengen Agreement