Requirement Verification Requirement verification checklist namely ‘Requirement checklist 01.00.00’ is used for review of requirements. Requirements are verified by inspection. Requirement statement is distributed to subject-matter experts one week in advance. A meeting is held with subject-matter experts to capture the comments.
Design Verification Designs (both high level and low level) are subjected to walkthrough. The entire project team will be reviewing the designs together. Design review checklist 01.02.00 is used for verification of designs. Walkthrough comment are captured.
Code Reviews Code review is generally subjected to peer review. Checklists are used for code reviews. 10% of the code may be reviewed by the team lead. Code review comments are captured.