if the client has addressed the potential risk within the system and to determine if the needs of their stakeholders have been addressed.
In addition the assessor shall review and confirm the contractual arrangements. This includes any changes required as a result of the outcome of the Stage 1 visit (including changes to the scope of assessment, duration of the Stage 2 visit, and duration of subsequent surveillance visits). The assessor shall also determine the planning, logistics, sampling, etc. that will be used during the Stage 2 visit