I would like to confirmed that the TOP Loading Platform shall be used Grating same as previous drawings provided by Khun Sitthikorn.
Please also expedite all Pending drawings (1st issue) e.g. Heating Coil Drawings, and other drawings commented from PTTEP especially the drawing no. 13065-NTM-A-MEC-DWG-009 (see attached file) which they awaiting for your revise drawings. And all this drawings shall be issued within this week (not late that this Friday, April 4th, 2014).