On 2/03/15 can’t be measured, because the production line does not pass through a sieve. The samples to customers from using the sieve in the laboratory.
On 3 /03/15 The Product yield (500 micron-5 mm.) = 46% , By product yield (<500 micron) = 33.3% and Waste yield = 13.3%.
The trial of 3/03/15 is not possible to measure the yield is less clear, Because the material used in the trial a 1 ton.
การแปล กรุณารอสักครู่..
