According to the Pm body & Production has inspected and repaired Pallet transfer respot line
now the total finish of 5 Unit. Still not be fixed in the 4 Unit from all 9 Unit the repair is the Pallet into the system.
The result is satisfactory, and will continue to work as usual. In the left will proceed to finish within this weekend.
And thank you for the Production cooperate to support the manpower as well