Dear P'Kukkai
I have one comment. On day 2, can they attach the "Inspection and testing method" to the new topic and propose about the content below:
3.1 Criteria for evaluation of results
3.2 Requirements traceability
3.3 Preparation
3.4 Inspection and Testing
3.5 Close out as same in the Factory Inspection a Testing Procedure for DWE.
Can they attach Factory Testing Documents which they will use for FAT PPLP?